Industrial CPM Scheduling

Palmetto has a great deal of experience handling the unique scheduling requirements of Industrial projects. These projects are resource driven and are often required to be resource loaded as well as cost loaded. More and more Industrial projects have Earned Value (EV) requirements and complicated specification requirements for construction scheduling. Frequently, industrial projects are part of a larger building program and require the schedule to adhere to a specific WBS and format for incorporation into the Master schedule. For all of the aforementioned reasons, outsourcing of CPM scheduling for industrial projects has become a growing trend, and Palmetto Scheduling is among the most experienced and qualified in the construction consulting field.

Boeing Dreamliner and 
BR&T Production Facilities
North Charleston, SC

As lead construction schedulers on this production facility, Palmetto Scheduling developed and maintained numerous Primavera P6 CPM schedules for several different GC’s working on the Boeing Dreamliner and BR&T facilities. All scheduling adhered to Boeing’s stringent cost loaded and Earned Value (EV) CPM schedule specification requirements. (see photo link page for photo source)

Lamb Pumping Station
Las Vegas, NV

As lead construction schedulers on this pumping station, Palmetto Scheduling developed the Primavera CPM target schedule for this pumping station facility for the GC. This 21 million dollar pumping facility served as a vital link in the Southern Nevada Water Authority’s water distribution system.

CPM Scheduling Industrial Project #3:

Santee Cooper Coal Fired Power Plant
Pineville, SC

As lead construction schedulers on this power plant, Palmetto Scheduling developed and maintained numerous Primavera CPM schedules for several different general contractors working on the new Santee Cooper coal fired power plant project. All were cost and resource loaded and used to generate all pay applications.