Contact Us: 843.377.0906 gquery@palmettoscheduling.com

Infrastructure CPM Scheduling – Roadways / Bridges / Waste & Water Treatment

As master CPM schedulers, Palmetto Scheduling has a great deal of experience handling the unique scheduling requirements of Infrastructure projects. Furthermore, we are well versed and experienced with scheduling to DOT specification requirements, and our CPM schedules reflect this.

Lake Marion Water Treatment Plant
Santee, SC

As master construction schedulers, Palmetto Scheduling developed and maintained cost and resource loaded Primavera CPM schedule for this full-capacity, raw-water pump station, clear wells, high service pumping station, membrane building, site pumping, electrical control building, sludge facility, raw water intake structure, and 54” raw water intake line extending 1500LF into Lake Marion.

McCarren Airport Tarmac Replacement
Concourse C & D Refurbishment
Las Vegas, NV

As master construction schedulers, Palmetto Scheduling developed and maintained a cost and resource loaded Primavera CPM schedule for the project. Pay applications were generated directly from the CPM schedule.

The Paul Gelegotis “Stono” Bridge 
Johns Island, SC

As master construction schedulers on this $41.5 million, four-lane, 7,300-foot long structure spanning the Stono River bridge, Palmetto Scheduling developed and maintained cost and resource loaded Primavera CPM schedule as per SCDOT specifications. (Photo by Cantbeatpie)